Graham Attrill Logo
 

 

 
 
 
 
 
 
Visit out Coastal Engineering Case Study Visit our Reinforced Concrete Structures page Visit our Highway page Visit our Commercial and Domestic Groundwork page Visit our design and build pages Visit case studies in cooperation with Authorities and the Environment Agency
Coastal
Engineering
Reinforced
concrete structures
highway
construction
Residential &
Commercial groundwork
design and build authorities & environment agencies
 
     
 
In History:    
    PROJECT DESCRIPTION    
jhj   Playground

Works were carried out next to the listed St Cross Water Mill building (dating from circa 1800) and office buildings, therefore vibration was minimised to avoid any potential localised ground movement (and consequential structural damage to the existing structures), as well as minimising the impact of noise on the local wildlife and adjacent business premises

 
Demolition of Ventnor Pier  

Ventnor Pier – Demolition Phase I and II complete.

 

 
Thumbnail image of Shanklin Pier on the Isle of Wight   1993 - Demolition of Shanklin Pier, Isle of Wight  
Bonchurch sea defence  

1987 - Sea Defence, Bonchurch, Isle of Wight

Coast Protection – Wheeler Bay to Bonchurch Supply all labour and plant to construct 800 meters of reinforced concrete seawall and all other associated works. Concrete Society Award winner. Contract completed 21 weeks ahead of schedule
 
       
       
 
     
 

t| 01983 865477 e|civilengineering@grahamattrill.co.uk
Copyright Graham Attrill Civil Engineering Ltd 2011
Website Design & Build by iGRAPHICdesigns

cpa lgo Isle of wight Council Environment Agencey
Company Sites